SEALED BID WITH LIVE AUCTION
Prototype Micro Ethanol Plant with Complete Laboratory
Building To Be Sold Separate
From Equipment
Equipment Sells as One Lot
Built in 2008
Operated for Less than a Year!
Large Open Building with Room for Expansion
Tract 1: 4,740 sq. ft. Building on 2.8± Acres
to remain in place with lease for land or to be removed.
Tract 2: Equipment & Laboratory Selling as ONE LOT
to remain in place with purchase of building
and lease terms or to be removed.
Sealed Bid Deadline is Friday, September 24 at 5 pm Central Time. At that time, Seller may determine the auction event is completed OR Seller may choose to invite the top 5 bidders to a limited LIVE AUCTION on Friday, October 8 in Parker, South Dakota.
Distillation Columns
Molecular Sieves
Process Tanks
Decanter Centrifuges
Grain Receiving, Handling, Storage, Weighing and Milling Equipment
Hammer Mill
Caustic Wash-in-Place
Boiler and Related Equipment
Related Process Equipment
Heat Exchangers
Cooling System
Plant Control Room
Complete Laboratory
Spare and Related Equipment
Facility Rendering Uncovered
Facility Rendering Covered
(These are very large files, allow time to download; requires .avi player such as Windows Media Player.)
Genesis Ethanol I was a prototype micro ethanol plant built in 2008 with several innovative concepts. Genesis Ethanol I purchased corn locally and sold its distiller grain by products locally, thereby greatly reducing transportation costs and delivering a consistent product. In addition, the facility was designed with energy-saving components unique to its design in an effort to reduce energy costs. Initially, the plant was to be the first born in a series of similar plants throughout the region. The plant was built with typical automation and monitoring with multiple security cameras placed strategically on-site. Summit Green Energy, the builder and managing partner, intended to capitalize on economies of scale by running multiple plants within the region. Although the micro ethanol plant began operations, it was not able to sustain its momentum with overwhelming external factors affecting the industry as well as some operational issues.
Design documents available upon signing a
confidentiality form.
INSPECTIONS:
Friday, September 10 • 12 pm - 4 pm
Thursday, September 23 • 12 pm - 4 pm
Other times by Appointment.