Thursday, December 13 5:00 PM
23133 East County Road 6
Canton, IL 61520

Brochure


Description

EQUIPMENT SUMMARY: Over $2.2 Million invested in Surplus Water Treatment Facility, new in 2007 the equipment has only operated for testing purposes. The equipment is owned by HWS Energy Partners and is considered surplus! Great Opportunity for Year End Buyers!

Located at Aventine Renewable Energy 38 MGY Ethanol Plant

CROWN SOLUTIONS INC Water Treatment Equipment Package including:
Skid Mounted Industrial Twin Water Softener, 2 48" x 72" Sidewall Tanks, lined and painted. 1,350,000 Grain Capacity/Tank.
Duplex Softener Supply Pump Skid. Continuous Softener Flow Rate of 345 GPM @ 15 psid, alternating or 690 GPM in parallel mode (TSSZ-1350-4S).
Twin RO System, each rated at 150 GPM @ 55 deg F. Prefilter housings (304SS). 2 High Pressure Feed Pumps. Control Enclosure with Touch screen Operator Interface. ORP Analyzer.

Bisulfite Feed System, 2 Bisulfite metering pumps, double walled storage tank, 2000 Gal Permeate Storage Tank, 1 Duplex Permeate Transfer Pump Skid. Clean in Place System, Concentrated Brine Filter Unit

BELDING TANK TECHNOLOGIES INC Vertical Fiberglass Bulk Salt Brine Storage Tank, 9,463 Gal Capacity, 10' x 15' Tall with TYCO THERMAL Controls

CECO Insulated Pre-Engineered Metal Building, 50' x 80' x 15' Eave Height, 2 Insulated OH Doors, 2 Man Doors, 9' Interior Liner Panel with Cutler Hammer Dry Type Distribution Transformer, Square D Plant Lighting Main Breaker Panel, LITHONIA Emergency Lighting, AO SMITH Water Heater , Modine Forced Air Heating Units

Click Here for Drawings.

2007 COOPER POWER SYSTEMS 750 KVA Transformer

CUTLER HAMMER Motor Control Center, 4 Section, Freedom Series 2100

HYDROMATIC Duplex Submersible Pump System, 2 Model S4QX Pumps with SUN STATE SYSTEMS Control Panel

Fire Pump System, AURORA PENTAIR PUMP GROUP, Centrifugal Fire Pump, Split Case Model 912 with JOSLYN CLARK Electric Controller Cabinet, Alarm Panel, Fire Protection Water Main, Manifold Piping, Fittings, Valves and Couplings and Victaulic Couplings Bolts & Nuts

See Equipment Catalog for Complete Details

EQUIPMENT REMOVAL: The equipment must be removed from the plant site within 30 days of the auction or by January 13, 2013. The CECO building must be removed within 60 days, or by February 13, 2013. Buyers are allowed to use the rigging company of their own choosing, provided the vendor can supply adequate liability and insurance documentation. Buyers are required to submit a rigging plan within 7 days of the auction.

INSPECTIONS:
Wednesday, December 5 • 9:00 am to 2:00 pm
Wednesday, December 12 • 9:00 am to 2:00 pm
Other times by Appointment.


View HWS Equipment in Canton, IL in a larger map

Payment Information

13% Buyer Premium. All funds due and payable on day of sale via cash or wire transfer (posting within 24 hours). No equipment can be removed from the site without full payment. Sales tax may apply. Buyers with exemption status must document this AT OR BEFORE REGISTRATION.

Full Terms

Equipment is selling AS-IS, WHERE-IS WITH NO WARRANTIES, GUARANTEES, EXPRESS OR IMPLIED. All items require a rigging commitment within 7 days. All equipment must be removed within 30 days, and the building must be removed within 60 days. All buyers are responsible to make removal and rigging arrangements; removal, packaging and transportation costs are the responsibility of buyer. All sales final. Subject to Prior Sale.

In all transactions, Auctioneer is acting as an Agent for the Seller. Buyers are urged to inspect items prior to purchase. Seller and Auctioneer are not responsible for items. All information received from reliable sources believed to be correct but not guaranteed by the Auction Company. Any announcement made during the auction takes precedence over any material published about this event. In the event of a dispute, Auctioneer has final decision. Selling Subject to Owner Confirmation. Valid Government Issued Photo ID required to obtain bidding number.